projects:biological_waste_treatment

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
projects:biological_waste_treatment [2025/03/16 21:30] equinnprojects:biological_waste_treatment [2025/03/17 13:13] (current) equinn
Line 8: Line 8:
  
 ==== Cost breakdown ==== ==== Cost breakdown ====
-The figures below include VAT (27 %).+The figures below include VAT (27 %). This was calculated on: 2025-03-17
  
   * Main tank: 1080000   * Main tank: 1080000