| ==== Cost breakdown ==== | ==== Cost breakdown ==== | ||
| - | The figures below include VAT (27 %). | + | The figures below include VAT (27 %). This was calculated on: 2025-03-17 |
| * Main tank: 1080000 | * Main tank: 1080000 | ||
| Line 16: | Line 16: | ||
| * Installation: | * Installation: | ||
| * Complete system: approx. 2300000 | * Complete system: approx. 2300000 | ||
| + | |||
| + | ==== Existing piping/ | ||
| + | {{: | ||