| Will have to do this through Laci, because then I get a bit of discount and also he is my contact to the people installing these things (and he did have a discussion with him). I'm worried about what will happen to potential pipes and other stuff running underground in the vicinity of the target area for the system. Will need to discover where they run exactly to make sure they wont get damaged during the digging phase of the installation. | Will have to do this through Laci, because then I get a bit of discount and also he is my contact to the people installing these things (and he did have a discussion with him). I'm worried about what will happen to potential pipes and other stuff running underground in the vicinity of the target area for the system. Will need to discover where they run exactly to make sure they wont get damaged during the digging phase of the installation. | ||
| - | Cost breakdown | + | ==== Cost breakdown |
| + | The figures below include | ||
| * Main tank: 1080000 | * Main tank: 1080000 | ||
| * Compressor: 77000 | * Compressor: 77000 | ||
| Line 14: | Line 16: | ||
| * Installation: | * Installation: | ||
| * Complete system: approx. 2300000 | * Complete system: approx. 2300000 | ||
| + | |||
| + | ==== Existing piping/ | ||
| + | {{: | ||