projects:biological_waste_treatment [2025/03/16 17:19] – created equinnprojects:biological_waste_treatment [2025/03/17 13:13] (current) equinn
Line 1: Line 1:
-ASIO kft +===== Biological waste water treatment system ===== 
-Cost breakdown (incl. VAT):+==== Project goals ==== 
 +To get rid of the low capacity and very cumbersome and smelly waste water tank that I have currently, and to be able to safely and propelry dispose of sewage. 
 +==== General information ==== 
 +Company name: ASIO kft 
 + 
 +Will have to do this through Laci, because then I get a bit of discount and also he is my contact to the people installing these things (and he did have a discussion with him)I'm worried about what will happen to potential pipes and other stuff running underground in the vicinity of the target area for the system. Will need to discover where they run exactly to make sure they wont get damaged during the digging phase of the installation. 
 + 
 +==== Cost breakdown ==== 
 +The figures below include VAT (27 %). This was calculated on2025-03-17 
   * Main tank: 1080000   * Main tank: 1080000
   * Compressor: 77000   * Compressor: 77000
Line 7: Line 16:
   * Installation: 381000   * Installation: 381000
   * Complete system: approx. 2300000   * Complete system: approx. 2300000
 +
 +==== Existing piping/cabling underground ====
 +{{:projects:cimg5254.jpg?200|}}{{:projects:cimg2244.jpg?200|}}